Highland Ave over City Creek
GoodSan Bernardino County, California · 0.1 MI E State HWY 330 · Structure no. 54C0600
- Built
- 1993
- 32 years old
- Condition
- Good
- inspected November 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 172 ft
- 1 main span
- Daily traffic
- 11,200
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Highland Ave over City Creek is a prestressed concrete box beam or girders - multiple carrying Highland Ave over City Creek in San Bernardino County, California. It was built in 1993, so it is 32 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 11,200 vehicles a day, roughly 2% of them trucks, projected to reach 27,060 by 2044. The structure is 172 ft (52.4 m) long and 75 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Highland Ave over City Creek built?
It was built in 1993, making it 32 years old in 2025.
What condition is Highland Ave over City Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does Highland Ave over City Creek carry?
About 11,200 vehicles per day (2018 count), of which roughly 2% are trucks.
How long is Highland Ave over City Creek?
The structure is 172 ft (52.4 m) long with a longest span of 168 ft (51.2 m) and a deck 75 ft wide.
Who owns Highland Ave over City Creek?
It is owned by the City or Municipal Highway Agency.