Mission Blvd over San Antonio Creek Chan
GoodSan Bernardino County, California · 50 Ft E/O L.A. Cnty Line · Structure no. 54C0220
- Built
- 1929
- 96 years old, rebuilt 1954
- Condition
- Good
- inspected June 2024
- Type
- Tee Beam
- Concrete
- Length
- 92 ft
- 3 main spans
- Daily traffic
- 20,177
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Mission Blvd over San Antonio Creek Chan is a concrete tee beam carrying Mission Blvd over San Antonio Creek Chan in San Bernardino County, California. It was built in 1929 and reconstructed in 1954, so it is 96 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 20,177 vehicles a day, roughly 1% of them trucks, projected to reach 27,763 by 2046. The structure is 92 ft (28 m) long and 89 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mission Blvd over San Antonio Creek Chan built?
It was built in 1929, making it 96 years old in 2025. It was reconstructed in 1954.
What condition is Mission Blvd over San Antonio Creek Chan in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does Mission Blvd over San Antonio Creek Chan carry?
About 20,177 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is Mission Blvd over San Antonio Creek Chan?
The structure is 92 ft (28 m) long with a longest span of 37 ft (11.3 m) and a deck 89 ft wide.
Who owns Mission Blvd over San Antonio Creek Chan?
It is owned by the County Highway Agency.