Orchard ST over San Antonio Creek Chan
FairSan Bernardino County, California · 0.3 MI E LA CO Line · Structure no. 54C0223
- Built
- 1972
- 53 years old
- Condition
- Fair
- inspected June 2024
- Type
- Slab
- Concrete
- Length
- 36 ft
- 1 main span
- Daily traffic
- 2,500
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Orchard ST over San Antonio Creek Chan is a concrete slab carrying Orchard ST over San Antonio Creek Chan in San Bernardino County, California. It was built in 1972, so it is 53 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,500 vehicles a day, roughly 1% of them trucks, projected to reach 3,041 by 2046. The structure is 36 ft (11 m) long and 76 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Orchard ST over San Antonio Creek Chan built?
It was built in 1972, making it 53 years old in 2025.
What condition is Orchard ST over San Antonio Creek Chan in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Orchard ST over San Antonio Creek Chan carry?
About 2,500 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is Orchard ST over San Antonio Creek Chan?
The structure is 36 ft (11 m) long with a longest span of 34 ft (10.4 m) and a deck 76 ft wide.
Who owns Orchard ST over San Antonio Creek Chan?
It is owned by the City or Municipal Highway Agency.