US Bridges

Inland Center DR over Interstate 215 & Ramps

Good

San Bernardino County, California · 08-SBD-215-5.58-SBD · Structure no. 54 1228

Built
2010
15 years old
Condition
Good
inspected February 2024
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
227 ft
2 main spans
Daily traffic
14,500
2020 count
Owner
State
State Highway Agency

About this bridge

Inland Center DR over Interstate 215 & Ramps is a concrete continuous box beam or girders - multiple carrying Inland Center DR over Interstate 215 & Ramps in San Bernardino County, California. It was built in 2010, so it is 15 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 14,500 vehicles a day, roughly 5% of them trucks, projected to reach 20,471 by 2042. The structure is 227 ft (69.1 m) long and 124 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesInland Center DR
CrossesInterstate 215 & Ramps
Location08-SBD-215-5.58-SBD
RouteCity Street 0R041
Coordinates34.08486, -117.30115
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length227 ft (69.1 m)
Longest span124 ft (37.7 m)
Deck width124 ft (37.8 m)
Roadway width109 ft (33.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,500 (2020)
Projected traffic20,471 by 2042
Trucks5%
Lanes on structure7
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Inland Center DR over Interstate 215 & Ramps built?

It was built in 2010, making it 15 years old in 2025.

What condition is Inland Center DR over Interstate 215 & Ramps in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Inland Center DR over Interstate 215 & Ramps carry?

About 14,500 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is Inland Center DR over Interstate 215 & Ramps?

The structure is 227 ft (69.1 m) long with a longest span of 124 ft (37.7 m) and a deck 124 ft wide.

Who owns Inland Center DR over Interstate 215 & Ramps?

It is owned by the State Highway Agency.