S215-ORANGE Show over Warm Creek
FairSan Bernardino County, California · 08-SBD-215-5.24-SBD · Structure no. 54 1232K
- Built
- 2010
- 15 years old
- Condition
- Fair
- inspected February 2024
- Type
- Box Beam or Girders - Single or Spread
- Concrete Continuous
- Length
- 157 ft
- 3 main spans
- Daily traffic
- 1,001
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
S215-ORANGE Show over Warm Creek is a concrete continuous box beam or girders - single or spread carrying S215-ORANGE Show over Warm Creek in San Bernardino County, California. It was built in 2010, so it is 15 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,001 vehicles a day, roughly 2% of them trucks, projected to reach 2,124 by 2044. The structure is 157 ft (48 m) long and 38 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S215-ORANGE Show over Warm Creek built?
It was built in 2010, making it 15 years old in 2025.
What condition is S215-ORANGE Show over Warm Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does S215-ORANGE Show over Warm Creek carry?
About 1,001 vehicles per day (2020 count), of which roughly 2% are trucks.
How long is S215-ORANGE Show over Warm Creek?
The structure is 157 ft (48 m) long with a longest span of 54 ft (16.4 m) and a deck 38 ft wide.
Who owns S215-ORANGE Show over Warm Creek?
It is owned by the State Highway Agency.