Interstate 215 NB over Fairway Santa Ana River
FairSan Bernardino County, California · 08-SBD-215-4.21-COL · Structure no. 54 0471R
- Built
- 1972
- 53 years old, rebuilt 2016
- Condition
- Fair
- inspected February 2024
- Type
- Tee Beam
- Concrete Continuous
- Length
- 710 ft
- 12 main spans
- Daily traffic
- 85,000
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Interstate 215 NB over Fairway Santa Ana River is a concrete continuous tee beam carrying Interstate 215 NB over Fairway Santa Ana River in San Bernardino County, California. It was built in 1972 and reconstructed in 2016, so it is 53 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 85,000 vehicles a day, roughly 10% of them trucks, projected to reach 122,828 by 2042. The structure is 710 ft (216.4 m) long and 71 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Interstate 215 NB over Fairway Santa Ana River built?
It was built in 1972, making it 53 years old in 2025. It was reconstructed in 2016.
What condition is Interstate 215 NB over Fairway Santa Ana River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Interstate 215 NB over Fairway Santa Ana River carry?
About 85,000 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is Interstate 215 NB over Fairway Santa Ana River?
The structure is 710 ft (216.4 m) long with a longest span of 65 ft (19.8 m) and a deck 71 ft wide.
Who owns Interstate 215 NB over Fairway Santa Ana River?
It is owned by the State Highway Agency.