Interstate 215 SB over Fairway Santa Ana River
GoodSan Bernardino County, California · 08-SBD-215-4.21-COL · Structure no. 54 0471L
- Built
- 1958
- 67 years old, rebuilt 2016
- Condition
- Good
- inspected January 2024
- Type
- Tee Beam
- Concrete Continuous
- Length
- 737 ft
- 12 main spans
- Daily traffic
- 87,500
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Interstate 215 SB over Fairway Santa Ana River is a concrete continuous tee beam carrying Interstate 215 SB over Fairway Santa Ana River in San Bernardino County, California. It was built in 1958 and reconstructed in 2016, so it is 67 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 87,500 vehicles a day, roughly 6% of them trucks, projected to reach 130,983 by 2044. The structure is 737 ft (224.6 m) long and 71 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Interstate 215 SB over Fairway Santa Ana River built?
It was built in 1958, making it 67 years old in 2025. It was reconstructed in 2016.
What condition is Interstate 215 SB over Fairway Santa Ana River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does Interstate 215 SB over Fairway Santa Ana River carry?
About 87,500 vehicles per day (2020 count), of which roughly 6% are trucks.
How long is Interstate 215 SB over Fairway Santa Ana River?
The structure is 737 ft (224.6 m) long with a longest span of 66 ft (20.1 m) and a deck 71 ft wide.
Who owns Interstate 215 SB over Fairway Santa Ana River?
It is owned by the State Highway Agency.