Wilton RD over Deer Creek
FairSacramento County, California · 1.0 MI E Grant Line RD · Structure no. 24C0079
- Built
- 1957
- 68 years old, rebuilt 1993
- Condition
- Fair
- inspected April 2023
- Type
- Slab
- Concrete Continuous
- Length
- 963 ft
- 40 main spans
- Daily traffic
- 11,000
- 2007 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Wilton RD over Deer Creek is a concrete continuous slab carrying Wilton RD over Deer Creek in Sacramento County, California. It was built in 1957 and reconstructed in 1993, so it is 68 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,000 vehicles a day, roughly 3% of them trucks, projected to reach 17,445 by 2043. The structure is 963 ft (293.4 m) long and 31 ft wide. If it were closed, the detour would be 14.3 mi (23 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Wilton RD over Deer Creek built?
It was built in 1957, making it 68 years old in 2025. It was reconstructed in 1993.
What condition is Wilton RD over Deer Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Wilton RD over Deer Creek carry?
About 11,000 vehicles per day (2007 count), of which roughly 3% are trucks.
How long is Wilton RD over Deer Creek?
The structure is 963 ft (293.4 m) long with a longest span of 24 ft (7.3 m) and a deck 31 ft wide.
Who owns Wilton RD over Deer Creek?
It is owned by the City or Municipal Highway Agency.