US Bridges

Palm Avenue over San Jacinto Mdp Line "e"

Good

Riverside County, California · 0.2 MI S/O 7th Street · Structure no. 56C0640

Built
2005
20 years old
Condition
Good
inspected July 2021
Type
Culvert
Concrete
Length
25 ft
2 main spans
Daily traffic
1,040
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

Palm Avenue over San Jacinto Mdp Line "e" is a concrete culvert carrying Palm Avenue over San Jacinto Mdp Line "e" in Riverside County, California. It was built in 2005, so it is 20 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,040 vehicles a day, roughly 3% of them trucks, projected to reach 2,053 by 2038. The structure is 25 ft (7.7 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesPalm Avenue
CrossesSan Jacinto Mdp Line "e"
Location0.2 MI S/O 7th Street
RouteCity Street 0
Coordinates33.77684, -116.98064
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionJuly 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length25 ft (7.7 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,040 (2019)
Projected traffic2,053 by 2038
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Palm Avenue over San Jacinto Mdp Line "e" built?

It was built in 2005, making it 20 years old in 2025.

What condition is Palm Avenue over San Jacinto Mdp Line "e" in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2021.

How much traffic does Palm Avenue over San Jacinto Mdp Line "e" carry?

About 1,040 vehicles per day (2019 count), of which roughly 3% are trucks.

How long is Palm Avenue over San Jacinto Mdp Line "e"?

The structure is 25 ft (7.7 m) long with a longest span of 12 ft (3.7 m).

Who owns Palm Avenue over San Jacinto Mdp Line "e"?

It is owned by the City or Municipal Highway Agency.