US Bridges

7th ST over San Jacinto Mdp Line "e"

Good

Riverside County, California · 0.2 MI E Lyon Avenue · Structure no. 56C0535

Built
2004
21 years old
Condition
Good
inspected April 2023
Type
Culvert
Concrete
Length
32 ft
2 main spans
Daily traffic
4,103
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

7th ST over San Jacinto Mdp Line "e" is a concrete culvert carrying 7th ST over San Jacinto Mdp Line "e" in Riverside County, California. It was built in 2004, so it is 21 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,103 vehicles a day, roughly 3% of them trucks, projected to reach 5,066 by 2041. The structure is 32 ft (9.9 m) long. If it were closed, the detour would be 1.9 mi (3 km).

Carries7th ST
CrossesSan Jacinto Mdp Line "e"
Location0.2 MI E Lyon Avenue
RouteCity Street 0
Coordinates33.77999, -116.98467
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20 + Mod
Structure length32 ft (9.9 m)
Longest span13 ft (4.1 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,103 (2018)
Projected traffic5,066 by 2041
Trucks3%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 7th ST over San Jacinto Mdp Line "e" built?

It was built in 2004, making it 21 years old in 2025.

What condition is 7th ST over San Jacinto Mdp Line "e" in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does 7th ST over San Jacinto Mdp Line "e" carry?

About 4,103 vehicles per day (2018 count), of which roughly 3% are trucks.

How long is 7th ST over San Jacinto Mdp Line "e"?

The structure is 32 ft (9.9 m) long with a longest span of 13 ft (4.1 m).

Who owns 7th ST over San Jacinto Mdp Line "e"?

It is owned by the City or Municipal Highway Agency.