US Bridges

91-15 Express over SB I-15 WB91

Good

Riverside County, California · 08-RIV-091-7.21-COR · Structure no. 56 0896E

Built
2023
2 years old
Condition
Good
inspected November 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
2,749 ft
16 main spans
Daily traffic
2,000
2023 count
Owner
State
State Highway Agency

About this bridge

91-15 Express over SB I-15 WB91 is a prestressed concrete continuous box beam or girders - multiple carrying 91-15 Express over SB I-15 WB91 in Riverside County, California. It was built in 2023, so it is 2 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,000 vehicles a day, roughly 1% of them trucks, projected to reach 2,690 by 2043. The structure is 2,749 ft (838 m) long and 70 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Carries91-15 Express
CrossesSB I-15 WB91
Location08-RIV-091-7.21-COR
RouteState Highway 91
Coordinates33.88072, -117.55056
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans16
Design loadHL 93
Structure length2,749 ft (838 m)
Longest span175 ft (53.3 m)
Deck width70 ft (21.4 m)
Roadway width54 ft (16.4 m)
Vertical clearance over deck19 ft (5.7 m)

Traffic and service

Average daily traffic2,000 (2023)
Projected traffic2,690 by 2043
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 91-15 Express over SB I-15 WB91 built?

It was built in 2023, making it 2 years old in 2025.

What condition is 91-15 Express over SB I-15 WB91 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does 91-15 Express over SB I-15 WB91 carry?

About 2,000 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is 91-15 Express over SB I-15 WB91?

The structure is 2,749 ft (838 m) long with a longest span of 175 ft (53.3 m) and a deck 70 ft wide.

Who owns 91-15 Express over SB I-15 WB91?

It is owned by the State Highway Agency.