E91-15 Connector over Temescal Wash BNSF Metro
FairRiverside County, California · 08-RIV-091-6.95-COR · Structure no. 56 0874G
- Built
- 2017
- 8 years old
- Condition
- Fair
- inspected April 2023
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 836 ft
- 4 main spans
- Daily traffic
- 11,650
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
E91-15 Connector over Temescal Wash BNSF Metro is a concrete continuous box beam or girders - multiple carrying E91-15 Connector over Temescal Wash BNSF Metro in Riverside County, California. It was built in 2017, so it is 8 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,650 vehicles a day, roughly 6% of them trucks, projected to reach 17,320 by 2040. The structure is 836 ft (254.8 m) long and 61 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E91-15 Connector over Temescal Wash BNSF Metro built?
It was built in 2017, making it 8 years old in 2025.
What condition is E91-15 Connector over Temescal Wash BNSF Metro in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does E91-15 Connector over Temescal Wash BNSF Metro carry?
About 11,650 vehicles per day (2021 count), of which roughly 6% are trucks.
How long is E91-15 Connector over Temescal Wash BNSF Metro?
The structure is 836 ft (254.8 m) long with a longest span of 220 ft (67.1 m) and a deck 61 ft wide.
Who owns E91-15 Connector over Temescal Wash BNSF Metro?
It is owned by the State Highway Agency.