US Bridges

N. Sunrise Avenue over Miners Ravine

Fair

Placer County, California · 0.1 M S of E Rosevill Pky · Structure no. 19C0232

Built
1998
27 years old
Condition
Fair
inspected April 2023
Type
Slab
Concrete Continuous
Length
242 ft
7 main spans
Daily traffic
16,784
2015 count
Owner
City
City or Municipal Highway Agency

About this bridge

N. Sunrise Avenue over Miners Ravine is a concrete continuous slab carrying N. Sunrise Avenue over Miners Ravine in Placer County, California. It was built in 1998, so it is 27 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 16,784 vehicles a day, roughly 1% of them trucks, projected to reach 27,449 by 2045. The structure is 242 ft (73.8 m) long and 111 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesN. Sunrise Avenue
CrossesMiners Ravine
Location0.1 M S of E Rosevill Pky
RouteCity Street 0
Coordinates38.76031, -121.25144
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating42.5 US tons
Inventory rating29.3 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans7
Design loadHS 20 + Mod
Structure length242 ft (73.8 m)
Longest span35 ft (10.7 m)
Deck width111 ft (33.8 m)
Roadway width98 ft (29.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,784 (2015)
Projected traffic27,449 by 2045
Trucks1%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was N. Sunrise Avenue over Miners Ravine built?

It was built in 1998, making it 27 years old in 2025.

What condition is N. Sunrise Avenue over Miners Ravine in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does N. Sunrise Avenue over Miners Ravine carry?

About 16,784 vehicles per day (2015 count), of which roughly 1% are trucks.

How long is N. Sunrise Avenue over Miners Ravine?

The structure is 242 ft (73.8 m) long with a longest span of 35 ft (10.7 m) and a deck 111 ft wide.

Who owns N. Sunrise Avenue over Miners Ravine?

It is owned by the City or Municipal Highway Agency.