El Paseo Road over BNSF RY AMTRAK Metrolink
GoodOrange County, California · 0.1 Mi. N/O Oso Parkway · Structure no. 55C0623
- Built
- 1994
- 31 years old
- Condition
- Good
- inspected May 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 348 ft
- 3 main spans
- Daily traffic
- 16,970
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
El Paseo Road over BNSF RY AMTRAK Metrolink is a prestressed concrete continuous box beam or girders - multiple carrying El Paseo Road over BNSF RY AMTRAK Metrolink in Orange County, California. It was built in 1994, so it is 31 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 16,970 vehicles a day, roughly 1% of them trucks, projected to reach 25,229 by 2044. The structure is 348 ft (106.2 m) long and 52 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was El Paseo Road over BNSF RY AMTRAK Metrolink built?
It was built in 1994, making it 31 years old in 2025.
What condition is El Paseo Road over BNSF RY AMTRAK Metrolink in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does El Paseo Road over BNSF RY AMTRAK Metrolink carry?
About 16,970 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is El Paseo Road over BNSF RY AMTRAK Metrolink?
The structure is 348 ft (106.2 m) long with a longest span of 145 ft (44.2 m) and a deck 52 ft wide.
Who owns El Paseo Road over BNSF RY AMTRAK Metrolink?
It is owned by the City or Municipal Highway Agency.