Barranca Parkway over Barranca Channel
PoorOrange County, California · 0.4 MI N/W Jamboree RD · Structure no. 55C0475
- Built
- 1975
- 50 years old
- Condition
- Poor
- inspected August 2024
- Type
- Culvert
- Concrete
- Length
- 37 ft
- 2 main spans
- Daily traffic
- 31,500
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Barranca Parkway over Barranca Channel is a concrete culvert carrying Barranca Parkway over Barranca Channel in Orange County, California. It was built in 1975, so it is 50 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 31,500 vehicles a day, roughly 7% of them trucks, projected to reach 49,734 by 2041. The structure is 37 ft (11.3 m) long and 175 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 8 Very Good | No problems noted. |
| Culvert | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Barranca Parkway over Barranca Channel built?
It was built in 1975, making it 50 years old in 2025.
What condition is Barranca Parkway over Barranca Channel in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in August 2024.
How much traffic does Barranca Parkway over Barranca Channel carry?
About 31,500 vehicles per day (2018 count), of which roughly 7% are trucks.
How long is Barranca Parkway over Barranca Channel?
The structure is 37 ft (11.3 m) long with a longest span of 17 ft (5.3 m) and a deck 175 ft wide.
Who owns Barranca Parkway over Barranca Channel?
It is owned by the City or Municipal Highway Agency.