Baranca Pkwy EB over Peters Canyon Channel
GoodOrange County, California · 0.2 MI E Jamboree RD · Structure no. 55C0342R
- Built
- 1978
- 47 years old
- Condition
- Good
- inspected November 2021
- Type
- Tee Beam
- Concrete Continuous
- Length
- 135 ft
- 3 main spans
- Daily traffic
- 10,500
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Baranca Pkwy EB over Peters Canyon Channel is a concrete continuous tee beam carrying Baranca Pkwy EB over Peters Canyon Channel in Orange County, California. It was built in 1978, so it is 47 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 10,500 vehicles a day, roughly 7% of them trucks, projected to reach 13,000 by 2040. The structure is 135 ft (41.1 m) long and 50 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Baranca Pkwy EB over Peters Canyon Channel built?
It was built in 1978, making it 47 years old in 2025.
What condition is Baranca Pkwy EB over Peters Canyon Channel in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2021.
How much traffic does Baranca Pkwy EB over Peters Canyon Channel carry?
About 10,500 vehicles per day (2018 count), of which roughly 7% are trucks.
How long is Baranca Pkwy EB over Peters Canyon Channel?
The structure is 135 ft (41.1 m) long with a longest span of 53 ft (16.2 m) and a deck 50 ft wide.
Who owns Baranca Pkwy EB over Peters Canyon Channel?
It is owned by the City or Municipal Highway Agency.