Valencia DR over Fullerton Creek Channel
GoodOrange County, California · 0.3 MI W/O Euclid ST · Structure no. 55C0235
- Built
- 1958
- 67 years old
- Condition
- Good
- inspected September 2023
- Type
- Slab
- Prestressed Concrete
- Length
- 50 ft
- 1 main span
- Daily traffic
- 14,800
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Valencia DR over Fullerton Creek Channel is a prestressed concrete slab carrying Valencia DR over Fullerton Creek Channel in Orange County, California. It was built in 1958, so it is 67 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 14,800 vehicles a day, roughly 1% of them trucks, projected to reach 23,907 by 2045. The structure is 50 ft (15.2 m) long and 76 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Valencia DR over Fullerton Creek Channel built?
It was built in 1958, making it 67 years old in 2025.
What condition is Valencia DR over Fullerton Creek Channel in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does Valencia DR over Fullerton Creek Channel carry?
About 14,800 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is Valencia DR over Fullerton Creek Channel?
The structure is 50 ft (15.2 m) long with a longest span of 50 ft (15.2 m) and a deck 76 ft wide.
Who owns Valencia DR over Fullerton Creek Channel?
It is owned by the City or Municipal Highway Agency.