Basque Ave over Fullerton Creek Channel
GoodOrange County, California · 0.1 MI N/O Valencia DR · Structure no. 55C0234
- Built
- 1961
- 64 years old
- Condition
- Good
- inspected September 2023
- Type
- Slab
- Prestressed Concrete
- Length
- 50 ft
- 1 main span
- Daily traffic
- 3,100
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Basque Ave over Fullerton Creek Channel is a prestressed concrete slab carrying Basque Ave over Fullerton Creek Channel in Orange County, California. It was built in 1961, so it is 64 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,100 vehicles a day, roughly 1% of them trucks, projected to reach 2,174 by 2045. The structure is 50 ft (15.2 m) long and 49 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Basque Ave over Fullerton Creek Channel built?
It was built in 1961, making it 64 years old in 2025.
What condition is Basque Ave over Fullerton Creek Channel in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does Basque Ave over Fullerton Creek Channel carry?
About 3,100 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is Basque Ave over Fullerton Creek Channel?
The structure is 50 ft (15.2 m) long with a longest span of 50 ft (15.2 m) and a deck 49 ft wide.
Who owns Basque Ave over Fullerton Creek Channel?
It is owned by the City or Municipal Highway Agency.