W/B Alicia Parkway over Scrra BNSF RY AMTRAK
FairOrange County, California · 0.20 MI Sw/O Jeronimo RD · Structure no. 55C0214L
- Built
- 1976
- 49 years old
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 103 ft
- 1 main span
- Daily traffic
- 21,500
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
W/B Alicia Parkway over Scrra BNSF RY AMTRAK is a prestressed concrete stringer/multi-beam or girder carrying W/B Alicia Parkway over Scrra BNSF RY AMTRAK in Orange County, California. It was built in 1976, so it is 49 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 21,500 vehicles a day, roughly 1% of them trucks, projected to reach 34,088 by 2044. The structure is 103 ft (31.4 m) long and 51 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was W/B Alicia Parkway over Scrra BNSF RY AMTRAK built?
It was built in 1976, making it 49 years old in 2025.
What condition is W/B Alicia Parkway over Scrra BNSF RY AMTRAK in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does W/B Alicia Parkway over Scrra BNSF RY AMTRAK carry?
About 21,500 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is W/B Alicia Parkway over Scrra BNSF RY AMTRAK?
The structure is 103 ft (31.4 m) long with a longest span of 100 ft (30.5 m) and a deck 51 ft wide.
Who owns W/B Alicia Parkway over Scrra BNSF RY AMTRAK?
It is owned by the City or Municipal Highway Agency.