Jeronimo Road over Aliso Creek
FairOrange County, California · 0.35 Mi. S/O Toro Road · Structure no. 55C0155
- Built
- 1974
- 51 years old
- Condition
- Fair
- inspected September 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 87 ft
- 1 main span
- Daily traffic
- 28,281
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Jeronimo Road over Aliso Creek is a prestressed concrete box beam or girders - multiple carrying Jeronimo Road over Aliso Creek in Orange County, California. It was built in 1974, so it is 51 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 28,281 vehicles a day, roughly 1% of them trucks, projected to reach 42,048 by 2045. The structure is 87 ft (26.5 m) long and 95 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Jeronimo Road over Aliso Creek built?
It was built in 1974, making it 51 years old in 2025.
What condition is Jeronimo Road over Aliso Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Jeronimo Road over Aliso Creek carry?
About 28,281 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is Jeronimo Road over Aliso Creek?
The structure is 87 ft (26.5 m) long with a longest span of 84 ft (25.6 m) and a deck 95 ft wide.
Who owns Jeronimo Road over Aliso Creek?
It is owned by the City or Municipal Highway Agency.