US Bridges

Marine Avenue over Balboa Island Channel

Fair

Orange County, California · 0.1 Mi. S/O Bayside Drive · Structure no. 55C0014

Built
1930
95 years old, rebuilt 1981
Condition
Fair
inspected June 2023
Type
Tee Beam
Concrete Continuous
Length
399 ft
19 main spans
Daily traffic
12,000
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Marine Avenue over Balboa Island Channel is a concrete continuous tee beam carrying Marine Avenue over Balboa Island Channel in Orange County, California. It was built in 1930 and reconstructed in 1981, so it is 95 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 12,000 vehicles a day, roughly 3% of them trucks, projected to reach 21,377 by 2040. The structure is 399 ft (121.6 m) long and 40 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesMarine Avenue
CrossesBalboa Island Channel
Location0.1 Mi. S/O Bayside Drive
RouteCity Street 0
Coordinates33.60871, -117.88976
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating68.6 US tons
Inventory rating41.1 US tons

Structure

Structure typeTee Beam
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans19
Design loadUnknown
Structure length399 ft (121.6 m)
Longest span26 ft (7.9 m)
Deck width40 ft (12.1 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,000 (2020)
Projected traffic21,377 by 2040
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Marine Avenue over Balboa Island Channel built?

It was built in 1930, making it 95 years old in 2025. It was reconstructed in 1981.

What condition is Marine Avenue over Balboa Island Channel in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does Marine Avenue over Balboa Island Channel carry?

About 12,000 vehicles per day (2020 count), of which roughly 3% are trucks.

How long is Marine Avenue over Balboa Island Channel?

The structure is 399 ft (121.6 m) long with a longest span of 26 ft (7.9 m) and a deck 40 ft wide.

Who owns Marine Avenue over Balboa Island Channel?

It is owned by the City or Municipal Highway Agency.