Via Lido over West Lido Channel
GoodOrange County, California · 0.3 Mi. E/O Newport Blvd · Structure no. 55C0013
- Built
- 1930
- 95 years old, rebuilt 1977
- Condition
- Good
- inspected June 2023
- Type
- Girder and Floorbeam System
- Steel
- Length
- 189 ft
- 3 main spans
- Daily traffic
- 12,500
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Via Lido over West Lido Channel is a steel girder and floorbeam system carrying Via Lido over West Lido Channel in Orange County, California. It was built in 1930 and reconstructed in 1977, so it is 95 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 12,500 vehicles a day, roughly 1% of them trucks, projected to reach 17,500 by 2040. The structure is 189 ft (57.6 m) long and 33 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Via Lido over West Lido Channel built?
It was built in 1930, making it 95 years old in 2025. It was reconstructed in 1977.
What condition is Via Lido over West Lido Channel in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does Via Lido over West Lido Channel carry?
About 12,500 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is Via Lido over West Lido Channel?
The structure is 189 ft (57.6 m) long with a longest span of 62 ft (18.9 m) and a deck 33 ft wide.
Who owns Via Lido over West Lido Channel?
It is owned by the City or Municipal Highway Agency.