N1-FREMONT ST Off over W68-N1 Connector Ramp
GoodMonterey County, California · 05-MON-001-R78.18-MON · Structure no. 44 0152S
- Built
- 1968
- 57 years old
- Condition
- Good
- inspected July 2023
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 120 ft
- 2 main spans
- Daily traffic
- 7,400
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
N1-FREMONT ST Off over W68-N1 Connector Ramp is a concrete continuous box beam or girders - multiple carrying N1-FREMONT ST Off over W68-N1 Connector Ramp in Monterey County, California. It was built in 1968, so it is 57 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,400 vehicles a day, roughly 8% of them trucks, projected to reach 12,385 by 2043. The structure is 120 ft (36.6 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N1-FREMONT ST Off over W68-N1 Connector Ramp built?
It was built in 1968, making it 57 years old in 2025.
What condition is N1-FREMONT ST Off over W68-N1 Connector Ramp in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does N1-FREMONT ST Off over W68-N1 Connector Ramp carry?
About 7,400 vehicles per day (2013 count), of which roughly 8% are trucks.
How long is N1-FREMONT ST Off over W68-N1 Connector Ramp?
The structure is 120 ft (36.6 m) long with a longest span of 60 ft (18.3 m) and a deck 38 ft wide.
Who owns N1-FREMONT ST Off over W68-N1 Connector Ramp?
It is owned by the State Highway Agency.