W68-S1 & S1-E68 Cn over SR 1 S1-E68 N1-FREMONT
FairMonterey County, California · 05-MON-068-R3.96-MON · Structure no. 44 0149E
- Built
- 1968
- 57 years old, rebuilt 1996
- Condition
- Fair
- inspected August 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 241 ft
- 1 main span
- Daily traffic
- 23,256
- 2008 count
- Owner
- State
- State Highway Agency
About this bridge
W68-S1 & S1-E68 Cn over SR 1 S1-E68 N1-FREMONT is a prestressed concrete box beam or girders - multiple carrying W68-S1 & S1-E68 Cn over SR 1 S1-E68 N1-FREMONT in Monterey County, California. It was built in 1968 and reconstructed in 1996, so it is 57 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 23,256 vehicles a day, roughly 3% of them trucks, projected to reach 30,013 by 2044. The structure is 241 ft (73.5 m) long and 52 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was W68-S1 & S1-E68 Cn over SR 1 S1-E68 N1-FREMONT built?
It was built in 1968, making it 57 years old in 2025. It was reconstructed in 1996.
What condition is W68-S1 & S1-E68 Cn over SR 1 S1-E68 N1-FREMONT in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does W68-S1 & S1-E68 Cn over SR 1 S1-E68 N1-FREMONT carry?
About 23,256 vehicles per day (2008 count), of which roughly 3% are trucks.
How long is W68-S1 & S1-E68 Cn over SR 1 S1-E68 N1-FREMONT?
The structure is 241 ft (73.5 m) long with a longest span of 103 ft (31.4 m) and a deck 52 ft wide.
Who owns W68-S1 & S1-E68 Cn over SR 1 S1-E68 N1-FREMONT?
It is owned by the State Highway Agency.