US Bridges

IRR Alpine Rd. 58 over Parker Creek

Fair

Modoc County, California · 0.3 MI N of Parker Cr.Rd. · Structure no. 03C0046

Built
1968
57 years old, rebuilt 1989
Condition
Fair
inspected August 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
27 ft
1 main span
Daily traffic
200
2012 count
Owner
County
County Highway Agency

About this bridge

IRR Alpine Rd. 58 over Parker Creek is a steel stringer/multi-beam or girder carrying IRR Alpine Rd. 58 over Parker Creek in Modoc County, California. It was built in 1968 and reconstructed in 1989, so it is 57 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 200 vehicles a day, roughly 8% of them trucks, projected to reach 367 by 2041. The structure is 27 ft (8.2 m) long and 22 ft wide. If it were closed, the detour would be 24.9 mi (40 km).

CarriesIRR Alpine Rd. 58
CrossesParker Creek
Location0.3 MI N of Parker Cr.Rd.
RouteCounty Highway 0
Coordinates41.50699, -120.43299
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection4 PoorAdvanced section loss, deterioration, spalling or scour.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating53.6 US tons
Inventory rating32.2 US tons

Structure

MaterialSteel
DeckCorrugated steel
Main spans1
Design loadUnknown
Structure length27 ft (8.2 m)
Longest span26 ft (7.9 m)
Deck width22 ft (6.7 m)
Roadway width22 ft (6.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2012)
Projected traffic367 by 2041
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed24.9 mi (40 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR Alpine Rd. 58 over Parker Creek built?

It was built in 1968, making it 57 years old in 2025. It was reconstructed in 1989.

What condition is IRR Alpine Rd. 58 over Parker Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does IRR Alpine Rd. 58 over Parker Creek carry?

About 200 vehicles per day (2012 count), of which roughly 8% are trucks.

How long is IRR Alpine Rd. 58 over Parker Creek?

The structure is 27 ft (8.2 m) long with a longest span of 26 ft (7.9 m) and a deck 22 ft wide.

Who owns IRR Alpine Rd. 58 over Parker Creek?

It is owned by the County Highway Agency.