Avenue 7 over Future High Speed Train
GoodMadera County, California · 0.1 M West of Road 33 · Structure no. 41C0224
- Built
- 2020
- 5 years old
- Condition
- Good
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 196 ft
- 2 main spans
- Daily traffic
- 1,000
- 2020 count
- Owner
- State
- Other State Agency
About this bridge
Avenue 7 over Future High Speed Train is a prestressed concrete continuous stringer/multi-beam or girder carrying Avenue 7 over Future High Speed Train in Madera County, California. It was built in 2020, so it is 5 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,000 vehicles a day, roughly 10% of them trucks, projected to reach 1,987 by 2043. The structure is 196 ft (59.7 m) long and 43 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Avenue 7 over Future High Speed Train built?
It was built in 2020, making it 5 years old in 2025.
What condition is Avenue 7 over Future High Speed Train in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does Avenue 7 over Future High Speed Train carry?
About 1,000 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is Avenue 7 over Future High Speed Train?
The structure is 196 ft (59.7 m) long with a longest span of 111 ft (33.8 m) and a deck 43 ft wide.
Who owns Avenue 7 over Future High Speed Train?
It is owned by the Other State Agency.