Avenue 9 over Future High Speed Rail
GoodMadera County, California · 0.7 MI E. of State RTE 99 · Structure no. 41C0225
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 177 ft
- 1 main span
- Daily traffic
- 800
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Avenue 9 over Future High Speed Rail is a prestressed concrete stringer/multi-beam or girder carrying Avenue 9 over Future High Speed Rail in Madera County, California. It was built in 2023, so it is 2 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 800 vehicles a day, roughly 32% of them trucks, projected to reach 1,400 by 2044. The structure is 177 ft (53.9 m) long and 67 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Avenue 9 over Future High Speed Rail built?
It was built in 2023, making it 2 years old in 2025.
What condition is Avenue 9 over Future High Speed Rail in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does Avenue 9 over Future High Speed Rail carry?
About 800 vehicles per day (2024 count), of which roughly 32% are trucks.
How long is Avenue 9 over Future High Speed Rail?
The structure is 177 ft (53.9 m) long with a longest span of 169 ft (51.5 m) and a deck 67 ft wide.
Who owns Avenue 9 over Future High Speed Rail?
It is owned by the County Highway Agency.