US Bridges

Ave 15 over M I D Canal

Fair

Madera County, California · 0.25 MI W RD 29 · Structure no. 41C0135

Built
1977
48 years old
Condition
Fair
inspected January 2024
Type
Slab
Concrete Continuous
Length
60 ft
2 main spans
Daily traffic
574
2020 count
Owner
County
County Highway Agency

About this bridge

Ave 15 over M I D Canal is a concrete continuous slab carrying Ave 15 over M I D Canal in Madera County, California. It was built in 1977, so it is 48 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 574 vehicles a day, roughly 7% of them trucks, projected to reach 819 by 2042. The structure is 60 ft (18.3 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesAve 15
CrossesM I D Canal
Location0.25 MI W RD 29
RouteCounty Highway 0
Coordinates36.96709, -120.02365
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating100 US tons
Inventory rating60.4 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length60 ft (18.3 m)
Longest span28 ft (8.5 m)
Deck width31 ft (9.3 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic574 (2020)
Projected traffic819 by 2042
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Ave 15 over M I D Canal built?

It was built in 1977, making it 48 years old in 2025.

What condition is Ave 15 over M I D Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does Ave 15 over M I D Canal carry?

About 574 vehicles per day (2020 count), of which roughly 7% are trucks.

How long is Ave 15 over M I D Canal?

The structure is 60 ft (18.3 m) long with a longest span of 28 ft (8.5 m) and a deck 31 ft wide.

Who owns Ave 15 over M I D Canal?

It is owned by the County Highway Agency.