US Bridges

Avenue 21 over Berenda Slough

Fair

Madera County, California · 0.55 MI E of RD 14 · Structure no. 41C0105

Built
1974
51 years old
Condition
Fair
inspected January 2024
Type
Slab
Concrete Continuous
Length
115 ft
4 main spans
Daily traffic
128
2021 count
Owner
County
County Highway Agency

About this bridge

Avenue 21 over Berenda Slough is a concrete continuous slab carrying Avenue 21 over Berenda Slough in Madera County, California. It was built in 1974, so it is 51 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 128 vehicles a day, roughly 10% of them trucks, projected to reach 173 by 2042. The structure is 115 ft (35.1 m) long and 32 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesAvenue 21
CrossesBerenda Slough
Location0.55 MI E of RD 14
RouteCounty Highway 0
Coordinates37.05445, -120.28466
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating41.1 US tons
Inventory rating28.2 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length115 ft (35.1 m)
Longest span28 ft (8.5 m)
Deck width32 ft (9.9 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic128 (2021)
Projected traffic173 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Avenue 21 over Berenda Slough built?

It was built in 1974, making it 51 years old in 2025.

What condition is Avenue 21 over Berenda Slough in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does Avenue 21 over Berenda Slough carry?

About 128 vehicles per day (2021 count), of which roughly 10% are trucks.

How long is Avenue 21 over Berenda Slough?

The structure is 115 ft (35.1 m) long with a longest span of 28 ft (8.5 m) and a deck 32 ft wide.

Who owns Avenue 21 over Berenda Slough?

It is owned by the County Highway Agency.