Avenue 19 1/2 over Berenda Slough
FairMadera County, California · 0.5 MI W of RD 14 · Structure no. 41C0103
- Built
- 1973
- 52 years old
- Condition
- Fair
- inspected January 2024
- Type
- Slab
- Concrete Continuous
- Length
- 123 ft
- 4 main spans
- Daily traffic
- 50
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Avenue 19 1/2 over Berenda Slough is a concrete continuous slab carrying Avenue 19 1/2 over Berenda Slough in Madera County, California. It was built in 1973, so it is 52 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50 vehicles a day, projected to reach 93 by 2042. The structure is 123 ft (37.5 m) long and 32 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Avenue 19 1/2 over Berenda Slough built?
It was built in 1973, making it 52 years old in 2025.
What condition is Avenue 19 1/2 over Berenda Slough in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Avenue 19 1/2 over Berenda Slough carry?
About 50 vehicles per day (2020 count).
How long is Avenue 19 1/2 over Berenda Slough?
The structure is 123 ft (37.5 m) long with a longest span of 30 ft (9.1 m) and a deck 32 ft wide.
Who owns Avenue 19 1/2 over Berenda Slough?
It is owned by the County Highway Agency.