Humane Way over Pomona Mt Vernon Sp/Up
GoodLos Angeles County, California · 0.3MI W/O SR-71 Fwy · Structure no. 53C1796
- Built
- 1982
- 43 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 340 ft
- 3 main spans
- Daily traffic
- 9,332
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Humane Way over Pomona Mt Vernon Sp/Up is a prestressed concrete continuous stringer/multi-beam or girder carrying Humane Way over Pomona Mt Vernon Sp/Up in Los Angeles County, California. It was built in 1982, so it is 43 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,332 vehicles a day, roughly 3% of them trucks, projected to reach 10,732 by 2041. The structure is 340 ft (103.6 m) long and 73 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Humane Way over Pomona Mt Vernon Sp/Up built?
It was built in 1982, making it 43 years old in 2025.
What condition is Humane Way over Pomona Mt Vernon Sp/Up in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does Humane Way over Pomona Mt Vernon Sp/Up carry?
About 9,332 vehicles per day (2017 count), of which roughly 3% are trucks.
How long is Humane Way over Pomona Mt Vernon Sp/Up?
The structure is 340 ft (103.6 m) long with a longest span of 92 ft (28 m) and a deck 73 ft wide.
Who owns Humane Way over Pomona Mt Vernon Sp/Up?
It is owned by the City or Municipal Highway Agency.