US Bridges

Humane Way over UP RR San Jose Crk Sf

Good

Los Angeles County, California · 0.3MI N/O Mission Blvd · Structure no. 53C1397

Built
1970
55 years old
Condition
Good
inspected December 2021
Type
Tee Beam
Concrete
Length
197 ft
4 main spans
Daily traffic
11,500
2013 count
Owner
City
City or Municipal Highway Agency

About this bridge

Humane Way over UP RR San Jose Crk Sf is a concrete tee beam carrying Humane Way over UP RR San Jose Crk Sf in Los Angeles County, California. It was built in 1970, so it is 55 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,500 vehicles a day, roughly 3% of them trucks, projected to reach 10,732 by 2041. The structure is 197 ft (60 m) long and 37 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHumane Way
CrossesUP RR San Jose Crk Sf
Location0.3MI N/O Mission Blvd
RouteCity Street 0L382
Coordinates34.05601, -117.79034
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment6: Equal to present minimum criteria
Operating rating63.9 US tons
Inventory rating38.3 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length197 ft (60 m)
Longest span55 ft (16.8 m)
Deck width37 ft (11.3 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,500 (2013)
Projected traffic10,732 by 2041
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Humane Way over UP RR San Jose Crk Sf built?

It was built in 1970, making it 55 years old in 2025.

What condition is Humane Way over UP RR San Jose Crk Sf in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2021.

How much traffic does Humane Way over UP RR San Jose Crk Sf carry?

About 11,500 vehicles per day (2013 count), of which roughly 3% are trucks.

How long is Humane Way over UP RR San Jose Crk Sf?

The structure is 197 ft (60 m) long with a longest span of 55 ft (16.8 m) and a deck 37 ft wide.

Who owns Humane Way over UP RR San Jose Crk Sf?

It is owned by the City or Municipal Highway Agency.