Main ST over Dominguez Chan
FairLos Angeles County, California · 0.1MI N/O I-405 Fwy · Structure no. 53C1457
- Built
- 1961
- 64 years old
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 216 ft
- 3 main spans
- Daily traffic
- 16,200
- 2014 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Main ST over Dominguez Chan is a prestressed concrete stringer/multi-beam or girder carrying Main ST over Dominguez Chan in Los Angeles County, California. It was built in 1961, so it is 64 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 16,200 vehicles a day, roughly 2% of them trucks, projected to reach 19,400 by 2043. The structure is 216 ft (65.8 m) long and 92 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Main ST over Dominguez Chan built?
It was built in 1961, making it 64 years old in 2025.
What condition is Main ST over Dominguez Chan in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Main ST over Dominguez Chan carry?
About 16,200 vehicles per day (2014 count), of which roughly 2% are trucks.
How long is Main ST over Dominguez Chan?
The structure is 216 ft (65.8 m) long with a longest span of 70 ft (21.3 m) and a deck 92 ft wide.
Who owns Main ST over Dominguez Chan?
It is owned by the City or Municipal Highway Agency.