US Bridges

N110-S405 Connectr over Figueroa Street

Good

Los Angeles County, California · 07-LA-110-8.58-CRSN · Structure no. 53 1139G

Built
1961
64 years old
Condition
Good
inspected March 2024
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
190 ft
4 main spans
Daily traffic
19,950
2020 count
Owner
State
State Highway Agency

About this bridge

N110-S405 Connectr over Figueroa Street is a concrete continuous box beam or girders - multiple carrying N110-S405 Connectr over Figueroa Street in Los Angeles County, California. It was built in 1961, so it is 64 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 19,950 vehicles a day, roughly 4% of them trucks, projected to reach 23,933 by 2046. The structure is 190 ft (57.9 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesN110-S405 Connectr
CrossesFigueroa Street
Location07-LA-110-8.58-CRSN
RouteInterstate 110
Coordinates33.85407, -118.28266
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating45 US tons
Inventory rating34.6 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length190 ft (57.9 m)
Longest span63 ft (19.2 m)
Deck width34 ft (10.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic19,950 (2020)
Projected traffic23,933 by 2046
Trucks4%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was N110-S405 Connectr over Figueroa Street built?

It was built in 1961, making it 64 years old in 2025.

What condition is N110-S405 Connectr over Figueroa Street in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does N110-S405 Connectr over Figueroa Street carry?

About 19,950 vehicles per day (2020 count), of which roughly 4% are trucks.

How long is N110-S405 Connectr over Figueroa Street?

The structure is 190 ft (57.9 m) long with a longest span of 63 ft (19.2 m) and a deck 34 ft wide.

Who owns N110-S405 Connectr over Figueroa Street?

It is owned by the State Highway Agency.