182nd Street over Dominguez Channel
GoodLos Angeles County, California · 0.45 M W/O Fwy 110 · Structure no. 53C1261
- Built
- 1964
- 61 years old, rebuilt 1997
- Condition
- Good
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 228 ft
- 3 main spans
- Daily traffic
- 13,134
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
182nd Street over Dominguez Channel is a prestressed concrete stringer/multi-beam or girder carrying 182nd Street over Dominguez Channel in Los Angeles County, California. It was built in 1964 and reconstructed in 1997, so it is 61 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 13,134 vehicles a day, roughly 1% of them trucks, projected to reach 15,820 by 2041. The structure is 228 ft (69.5 m) long and 82 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 182nd Street over Dominguez Channel built?
It was built in 1964, making it 61 years old in 2025. It was reconstructed in 1997.
What condition is 182nd Street over Dominguez Channel in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does 182nd Street over Dominguez Channel carry?
About 13,134 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is 182nd Street over Dominguez Channel?
The structure is 228 ft (69.5 m) long with a longest span of 77 ft (23.4 m) and a deck 82 ft wide.
Who owns 182nd Street over Dominguez Channel?
It is owned by the City or Municipal Highway Agency.