US Bridges

Park & Ride Access over Dominguez Channel

Good

Los Angeles County, California · 07-LA-091-6.03-LA · Structure no. 53 2760Y

Built
1994
31 years old
Condition
Good
inspected May 2023
Type
Slab
Concrete Continuous
Length
74 ft
2 main spans
Daily traffic
4,600
2015 count
Owner
State
State Highway Agency

About this bridge

Park & Ride Access over Dominguez Channel is a concrete continuous slab carrying Park & Ride Access over Dominguez Channel in Los Angeles County, California. It was built in 1994, so it is 31 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,600 vehicles a day, roughly 1% of them trucks, projected to reach 6,182 by 2040. The structure is 74 ft (22.6 m) long and 53 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesPark & Ride Access
CrossesDominguez Channel
Location07-LA-091-6.03-LA
RouteState Highway 91
Coordinates33.87142, -118.29051
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment3: Basically intolerable, requiring high priority of corrective action
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length74 ft (22.6 m)
Longest span37 ft (11.3 m)
Deck width53 ft (16.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,600 (2015)
Projected traffic6,182 by 2040
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Park & Ride Access over Dominguez Channel built?

It was built in 1994, making it 31 years old in 2025.

What condition is Park & Ride Access over Dominguez Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Park & Ride Access over Dominguez Channel carry?

About 4,600 vehicles per day (2015 count), of which roughly 1% are trucks.

How long is Park & Ride Access over Dominguez Channel?

The structure is 74 ft (22.6 m) long with a longest span of 37 ft (11.3 m) and a deck 53 ft wide.

Who owns Park & Ride Access over Dominguez Channel?

It is owned by the State Highway Agency.