US Bridges

Titian Ave over Bee Canyon Waterway

Good

Los Angeles County, California · Bet Orozco & Van Gogh ST · Structure no. 53C1069

Built
1966
59 years old
Condition
Good
inspected August 2024
Type
Culvert
Concrete
Length
38 ft
3 main spans
Daily traffic
2,920
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

Titian Ave over Bee Canyon Waterway is a concrete culvert carrying Titian Ave over Bee Canyon Waterway in Los Angeles County, California. It was built in 1966, so it is 59 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,920 vehicles a day, roughly 2% of them trucks, projected to reach 3,759 by 2046. The structure is 38 ft (11.6 m) long and 80 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesTitian Ave
CrossesBee Canyon Waterway
LocationBet Orozco & Van Gogh ST
RouteCity Street 0
Coordinates34.30622, -118.50633
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadUnknown
Structure length38 ft (11.6 m)
Longest span12 ft (3.7 m)
Deck width80 ft (24.4 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,920 (2018)
Projected traffic3,759 by 2046
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Titian Ave over Bee Canyon Waterway built?

It was built in 1966, making it 59 years old in 2025.

What condition is Titian Ave over Bee Canyon Waterway in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Titian Ave over Bee Canyon Waterway carry?

About 2,920 vehicles per day (2018 count), of which roughly 2% are trucks.

How long is Titian Ave over Bee Canyon Waterway?

The structure is 38 ft (11.6 m) long with a longest span of 12 ft (3.7 m) and a deck 80 ft wide.

Who owns Titian Ave over Bee Canyon Waterway?

It is owned by the City or Municipal Highway Agency.