Culver Blvd over Ballona CR
FairLos Angeles County, California · 0.1MI W/O Lincoln Blvd · Structure no. 53C0602
- Built
- 1937
- 88 years old
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 372 ft
- 4 main spans
- Daily traffic
- 22,838
- 2014 count
- Owner
- County
- County Highway Agency
About this bridge
Culver Blvd over Ballona CR is a steel stringer/multi-beam or girder carrying Culver Blvd over Ballona CR in Los Angeles County, California. It was built in 1937, so it is 88 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 22,838 vehicles a day, roughly 2% of them trucks, projected to reach 27,405 by 2044. The structure is 372 ft (113.4 m) long and 39 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Culver Blvd over Ballona CR built?
It was built in 1937, making it 88 years old in 2025.
What condition is Culver Blvd over Ballona CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Culver Blvd over Ballona CR carry?
About 22,838 vehicles per day (2014 count), of which roughly 2% are trucks.
How long is Culver Blvd over Ballona CR?
The structure is 372 ft (113.4 m) long with a longest span of 100 ft (30.5 m) and a deck 39 ft wide.
Who owns Culver Blvd over Ballona CR?
It is owned by the County Highway Agency.