E&W134-E2 Connectr over Glenoaks Blvd
GoodLos Angeles County, California · 07-LA-134-R9.03-GNDL · Structure no. 53 2693H
- Built
- 1978
- 47 years old
- Condition
- Good
- inspected November 2023
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 250 ft
- 3 main spans
- Daily traffic
- 24,787
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
E&W134-E2 Connectr over Glenoaks Blvd is a concrete continuous box beam or girders - multiple carrying E&W134-E2 Connectr over Glenoaks Blvd in Los Angeles County, California. It was built in 1978, so it is 47 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 24,787 vehicles a day, roughly 3% of them trucks, projected to reach 30,245 by 2040. The structure is 250 ft (76.3 m) long and 48 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E&W134-E2 Connectr over Glenoaks Blvd built?
It was built in 1978, making it 47 years old in 2025.
What condition is E&W134-E2 Connectr over Glenoaks Blvd in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does E&W134-E2 Connectr over Glenoaks Blvd carry?
About 24,787 vehicles per day (2020 count), of which roughly 3% are trucks.
How long is E&W134-E2 Connectr over Glenoaks Blvd?
The structure is 250 ft (76.3 m) long with a longest span of 88 ft (26.8 m) and a deck 48 ft wide.
Who owns E&W134-E2 Connectr over Glenoaks Blvd?
It is owned by the State Highway Agency.