US Bridges

W134-E2 Connector over Holly DR

Good

Los Angeles County, California · 07-LA-134-R9.04-GNDL · Structure no. 53 1948F

Built
1978
47 years old
Condition
Good
inspected November 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
144 ft
1 main span
Daily traffic
3,850
2020 count
Owner
State
State Highway Agency

About this bridge

W134-E2 Connector over Holly DR is a prestressed concrete box beam or girders - multiple carrying W134-E2 Connector over Holly DR in Los Angeles County, California. It was built in 1978, so it is 47 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,850 vehicles a day, roughly 3% of them trucks, projected to reach 5,100 by 2040. The structure is 144 ft (43.8 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesW134-E2 Connector
CrossesHolly DR
Location07-LA-134-R9.04-GNDL
RouteState Highway 134
Coordinates34.14962, -118.22451
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating56.4 US tons
Inventory rating34.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length144 ft (43.8 m)
Longest span142 ft (43.2 m)
Deck width28 ft (8.4 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,850 (2020)
Projected traffic5,100 by 2040
Trucks3%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was W134-E2 Connector over Holly DR built?

It was built in 1978, making it 47 years old in 2025.

What condition is W134-E2 Connector over Holly DR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does W134-E2 Connector over Holly DR carry?

About 3,850 vehicles per day (2020 count), of which roughly 3% are trucks.

How long is W134-E2 Connector over Holly DR?

The structure is 144 ft (43.8 m) long with a longest span of 142 ft (43.2 m) and a deck 28 ft wide.

Who owns W134-E2 Connector over Holly DR?

It is owned by the State Highway Agency.