S5-STADIUM Way Off over Newell Street
FairLos Angeles County, California · 07-LA-005-22.26-LA · Structure no. 53 0162K
- Built
- 1961
- 64 years old
- Condition
- Fair
- inspected April 2023
- Type
- Box Beam or Girders - Multiple
- Concrete
- Length
- 69 ft
- 1 main span
- Daily traffic
- 2,450
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
S5-STADIUM Way Off over Newell Street is a concrete box beam or girders - multiple carrying S5-STADIUM Way Off over Newell Street in Los Angeles County, California. It was built in 1961, so it is 64 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,450 vehicles a day, roughly 2% of them trucks, projected to reach 4,395 by 2042. The structure is 69 ft (21 m) long and 26 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S5-STADIUM Way Off over Newell Street built?
It was built in 1961, making it 64 years old in 2025.
What condition is S5-STADIUM Way Off over Newell Street in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does S5-STADIUM Way Off over Newell Street carry?
About 2,450 vehicles per day (2019 count), of which roughly 2% are trucks.
How long is S5-STADIUM Way Off over Newell Street?
The structure is 69 ft (21 m) long with a longest span of 68 ft (20.7 m) and a deck 26 ft wide.
Who owns S5-STADIUM Way Off over Newell Street?
It is owned by the State Highway Agency.