E&W2-S5 Connector over Newell Street
GoodLos Angeles County, California · 07-LA-002-14.97-LA · Structure no. 53 0162H
- Built
- 1961
- 64 years old
- Condition
- Good
- inspected March 2025
- Type
- Box Beam or Girders - Multiple
- Concrete
- Length
- 69 ft
- 1 main span
- Daily traffic
- 35,200
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
E&W2-S5 Connector over Newell Street is a concrete box beam or girders - multiple carrying E&W2-S5 Connector over Newell Street in Los Angeles County, California. It was built in 1961, so it is 64 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 35,200 vehicles a day, roughly 5% of them trucks, projected to reach 49,777 by 2047. The structure is 69 ft (21 m) long and 49 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E&W2-S5 Connector over Newell Street built?
It was built in 1961, making it 64 years old in 2025.
What condition is E&W2-S5 Connector over Newell Street in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2025.
How much traffic does E&W2-S5 Connector over Newell Street carry?
About 35,200 vehicles per day (2019 count), of which roughly 5% are trucks.
How long is E&W2-S5 Connector over Newell Street?
The structure is 69 ft (21 m) long with a longest span of 67 ft (20.4 m) and a deck 49 ft wide.
Who owns E&W2-S5 Connector over Newell Street?
It is owned by the State Highway Agency.