Mcdaniel RD over Reservation Main Drain
FairImperial County, California · 0.4 MI N/O Ross RD · Structure no. 58C0168
- Built
- 1985
- 40 years old
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 30 ft
- 2 main spans
- Daily traffic
- 80
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Mcdaniel RD over Reservation Main Drain is a wood or timber stringer/multi-beam or girder carrying Mcdaniel RD over Reservation Main Drain in Imperial County, California. It was built in 1985, so it is 40 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 80 vehicles a day, roughly 1% of them trucks, projected to reach 86 by 2043. The structure is 30 ft (9.1 m) long and 25 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mcdaniel RD over Reservation Main Drain built?
It was built in 1985, making it 40 years old in 2025.
What condition is Mcdaniel RD over Reservation Main Drain in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Mcdaniel RD over Reservation Main Drain carry?
About 80 vehicles per day (2021 count), of which roughly 1% are trucks.
How long is Mcdaniel RD over Reservation Main Drain?
The structure is 30 ft (9.1 m) long with a longest span of 15 ft (4.6 m) and a deck 25 ft wide.
Who owns Mcdaniel RD over Reservation Main Drain?
It is owned by the County Highway Agency.