Ross RD over Reservation Main Drain
GoodImperial County, California · 0.85 MI E/O Picacho RD · Structure no. 58C0084
- Built
- 1940
- 85 years old, rebuilt 2017
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 92 ft
- 6 main spans
- Daily traffic
- 1,650
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Ross RD over Reservation Main Drain is a wood or timber stringer/multi-beam or girder carrying Ross RD over Reservation Main Drain in Imperial County, California. It was built in 1940 and reconstructed in 2017, so it is 85 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,650 vehicles a day, roughly 2% of them trucks, projected to reach 1,930 by 2045. The structure is 92 ft (28 m) long and 26 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ross RD over Reservation Main Drain built?
It was built in 1940, making it 85 years old in 2025. It was reconstructed in 2017.
What condition is Ross RD over Reservation Main Drain in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does Ross RD over Reservation Main Drain carry?
About 1,650 vehicles per day (2023 count), of which roughly 2% are trucks.
How long is Ross RD over Reservation Main Drain?
The structure is 92 ft (28 m) long with a longest span of 15 ft (4.6 m) and a deck 26 ft wide.
Who owns Ross RD over Reservation Main Drain?
It is owned by the County Highway Agency.