W Herndon Ave over 3rd Lift Canal
FairFresno County, California · 0.3 MI East of Jerrold Av · Structure no. 42C0509
- Built
- 1944
- 81 years old, rebuilt 1968
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 23 ft
- 1 main span
- Daily traffic
- 125
- 2010 count
- Owner
- County
- County Highway Agency
About this bridge
W Herndon Ave over 3rd Lift Canal is a wood or timber stringer/multi-beam or girder carrying W Herndon Ave over 3rd Lift Canal in Fresno County, California. It was built in 1944 and reconstructed in 1968, so it is 81 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 125 vehicles a day, roughly 40% of them trucks, projected to reach 216 by 2040. The structure is 23 ft (7 m) long and 24 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was W Herndon Ave over 3rd Lift Canal built?
It was built in 1944, making it 81 years old in 2025. It was reconstructed in 1968.
What condition is W Herndon Ave over 3rd Lift Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does W Herndon Ave over 3rd Lift Canal carry?
About 125 vehicles per day (2010 count), of which roughly 40% are trucks.
How long is W Herndon Ave over 3rd Lift Canal?
The structure is 23 ft (7 m) long with a longest span of 22 ft (6.7 m) and a deck 24 ft wide.
Who owns W Herndon Ave over 3rd Lift Canal?
It is owned by the County Highway Agency.