W Herndon Ave over 2nd Lift Canal
FairFresno County, California · 1.5 MI East of Jerrold Av · Structure no. 42C0404
- Built
- 1965
- 60 years old
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 54 ft
- 1 main span
- Daily traffic
- 125
- 2010 count
- Owner
- County
- County Highway Agency
About this bridge
W Herndon Ave over 2nd Lift Canal is a steel stringer/multi-beam or girder carrying W Herndon Ave over 2nd Lift Canal in Fresno County, California. It was built in 1965, so it is 60 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 125 vehicles a day, roughly 40% of them trucks, projected to reach 216 by 2040. The structure is 54 ft (16.5 m) long and 21 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was W Herndon Ave over 2nd Lift Canal built?
It was built in 1965, making it 60 years old in 2025.
What condition is W Herndon Ave over 2nd Lift Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does W Herndon Ave over 2nd Lift Canal carry?
About 125 vehicles per day (2010 count), of which roughly 40% are trucks.
How long is W Herndon Ave over 2nd Lift Canal?
The structure is 54 ft (16.5 m) long with a longest span of 47 ft (14.2 m) and a deck 21 ft wide.
Who owns W Herndon Ave over 2nd Lift Canal?
It is owned by the County Highway Agency.