N Wishon Ave over Herndon Canal
FairFresno County, California · South of Lansing Way · Structure no. 42C0333
- Built
- 1988
- 37 years old
- Condition
- Fair
- inspected December 2024
- Type
- Slab
- Concrete Continuous
- Length
- 57 ft
- 2 main spans
- Daily traffic
- 800
- 2011 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
N Wishon Ave over Herndon Canal is a concrete continuous slab carrying N Wishon Ave over Herndon Canal in Fresno County, California. It was built in 1988, so it is 37 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 800 vehicles a day, roughly 1% of them trucks, projected to reach 1,033 by 2042. The structure is 57 ft (17.5 m) long and 54 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N Wishon Ave over Herndon Canal built?
It was built in 1988, making it 37 years old in 2025.
What condition is N Wishon Ave over Herndon Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does N Wishon Ave over Herndon Canal carry?
About 800 vehicles per day (2011 count), of which roughly 1% are trucks.
How long is N Wishon Ave over Herndon Canal?
The structure is 57 ft (17.5 m) long with a longest span of 28 ft (8.5 m) and a deck 54 ft wide.
Who owns N Wishon Ave over Herndon Canal?
It is owned by the City or Municipal Highway Agency.