W Shaw Ave over Herndon Canal
FairFresno County, California · 0.05 MI West of Brawley · Structure no. 42C0117
- Built
- 1951
- 74 years old, rebuilt 1993
- Condition
- Fair
- inspected December 2024
- Type
- Slab
- Concrete Continuous
- Length
- 76 ft
- 3 main spans
- Daily traffic
- 42,995
- 2005 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
W Shaw Ave over Herndon Canal is a concrete continuous slab carrying W Shaw Ave over Herndon Canal in Fresno County, California. It was built in 1951 and reconstructed in 1993, so it is 74 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 42,995 vehicles a day, roughly 7% of them trucks, projected to reach 39,384 by 2042. The structure is 76 ft (23.2 m) long and 122 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was W Shaw Ave over Herndon Canal built?
It was built in 1951, making it 74 years old in 2025. It was reconstructed in 1993.
What condition is W Shaw Ave over Herndon Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does W Shaw Ave over Herndon Canal carry?
About 42,995 vehicles per day (2005 count), of which roughly 7% are trucks.
How long is W Shaw Ave over Herndon Canal?
The structure is 76 ft (23.2 m) long with a longest span of 25 ft (7.6 m) and a deck 122 ft wide.
Who owns W Shaw Ave over Herndon Canal?
It is owned by the City or Municipal Highway Agency.