N Brawley Ave over Herndon Canal
FairFresno County, California · South of Shaw Ave · Structure no. 42C0114
- Built
- 1925
- 100 years old, rebuilt 1988
- Condition
- Fair
- inspected December 2024
- Type
- Slab
- Concrete Continuous
- Length
- 44 ft
- 2 main spans
- Daily traffic
- 13,654
- 2010 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
N Brawley Ave over Herndon Canal is a concrete continuous slab carrying N Brawley Ave over Herndon Canal in Fresno County, California. It was built in 1925 and reconstructed in 1988, so it is 100 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 13,654 vehicles a day, roughly 7% of them trucks, projected to reach 15,317 by 2042. The structure is 44 ft (13.4 m) long and 119 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N Brawley Ave over Herndon Canal built?
It was built in 1925, making it 100 years old in 2025. It was reconstructed in 1988.
What condition is N Brawley Ave over Herndon Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does N Brawley Ave over Herndon Canal carry?
About 13,654 vehicles per day (2010 count), of which roughly 7% are trucks.
How long is N Brawley Ave over Herndon Canal?
The structure is 44 ft (13.4 m) long with a longest span of 22 ft (6.7 m) and a deck 119 ft wide.
Who owns N Brawley Ave over Herndon Canal?
It is owned by the City or Municipal Highway Agency.