Busch to El Charro over Arroyo Mocho
FairAlameda County, California · 2000 Ft S of 580 · Structure no. 33C0458
- Built
- 2003
- 22 years old
- Condition
- Fair
- inspected October 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 220 ft
- 2 main spans
- Daily traffic
- 7,700
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Busch to El Charro over Arroyo Mocho is a prestressed concrete continuous box beam or girders - multiple carrying Busch to El Charro over Arroyo Mocho in Alameda County, California. It was built in 2003, so it is 22 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,700 vehicles a day, roughly 10% of them trucks, projected to reach 14,674 by 2042. The structure is 220 ft (67 m) long and 44 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Busch to El Charro over Arroyo Mocho built?
It was built in 2003, making it 22 years old in 2025.
What condition is Busch to El Charro over Arroyo Mocho in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Busch to El Charro over Arroyo Mocho carry?
About 7,700 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is Busch to El Charro over Arroyo Mocho?
The structure is 220 ft (67 m) long with a longest span of 110 ft (33.4 m) and a deck 44 ft wide.
Who owns Busch to El Charro over Arroyo Mocho?
It is owned by the City or Municipal Highway Agency.